Ubit GA & GC Slot Addition and Gas Lift Project

Project Details

Ubit GA & GC Slot Addition and Gas Lift Project

Client: Mobil producing Nigeria unlimited

Location: Eket

Cakasa (CESL) performed Detailed Engineering Design (DED) for the Installation of 4” flow line from gas source well to gas lift manifold and Installation of a six-slot gas lift manifold (4” ANSI 900) with appropriate instrumentation (i.e. PSHH/PSLL) for Ubit GA

ceslUbit GA & GC Slot Addition and Gas Lift Project