OML 99 Amenam Oily Water Treatment Upgrade Project (2011/2012)

Project Details

OML 99 Amenam Oily Water Treatment Upgrade Project (2011/2012)

Client: Total Exploration and Production Nigeria Limited

Location: Port Harcourt

Cakasa performed Detailed Engineering Design (DED) to address the problem of rapid increase in the formation of water production arising from the ageing of the facility.

The two phases of the project included design of water treatment facilities with temporary option of disposal to sea and re-injection of Treated Produced Water or disposal to sea.

This study focused on design and implementation of Phase 1 while Phase 2 was put on hold pending results from the Produced Water Re-injection Test (planned for a later date) to monitor the behaviour of the reservoir to mixing of sea water and produced water.