Abiteye NAG Development Project (FEED)

Abiteye NAG Development Project (FEED)

Client: Chevron Nigeria Limited

Location: Offshore – Escravos, Nigeria

Cakasa performed Front End Engineering Design (FEED) on Abiteye Facility in support of the client’s plan to develop Escravos Gas Plant (EGP) that was experiencing gas supply shortfall and was forecasted to increase over time due to decline of existing gas supply fields.

Abiteye NAG Project is a key contributor to Chevron’s short term gas supply commitments to deliver additional volumes of gas to Escravos Lagos Pipeline System (ELPS) via the existing EGP by-pass contributing to fulfil domestic market gas demand.

The FEED was carried out to enable Chevron evaluate the economics of the planned development before proceeding with Detailed Engineering Design (DED).

AdministratorAbiteye NAG Development Project (FEED)